Final | 4/12/2001 | 4/13/2001 | 4/13/2001 | P | PASS |
Marv Burrus
|
|
|
George ###-#### rb pedestal area e 1-4. phase 1 and phase 2 completed. ok. 4/13/2001 1:55:13 PM
|
Electrical Rough-In | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | PASS |
Marv Burrus
|
|
|
fourth floor lobby George ###-####. area'e' lobby; ceiling r/i. 4/3/2001 10:30:22 AM
|
Final | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | PART |
Marv Burrus
|
|
|
###-#### George on the first floor. 4th floor lobby area 'e'. temporary occupancy. 4/3/2001 10:33:40 AM 4/3/2001 10:34:05 AM
|
Electrical Rough-In | 3/30/2001 | 3/30/2001 | 3/30/2001 | P | FAIL |
Marv Burrus
|
|
|
###-####. 4th floor: ceiling tiles installed before ceiling inspection. informed contractor to have removed for reinspection. 3/30/2001 2:32:08 PM
|
Electrical Rough-In | 3/23/2001 | 3/23/2001 | 3/23/2001 | P | PART |
Marv Burrus
|
|
|
###-####. 1st floor lobby ceiling & wall r/i.
2nd & 3rd floor serve-out partial. 3/23/2001 2:48:26 PM
|
Electrical Rough-In | 3/13/2001 | 3/14/2001 | 3/14/2001 | A | PART |
Marv Burrus
|
|
|
ceiling 2nd and 3rd E lobbies George ###-####. serve-outs, and sawthooth re-hab ceiling ele r/i. ok. 3/14/2001 10:54:13 AM
|
Electrical Rough-In | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | PART |
Marv Burrus
|
|
|
1st floor arear E r/i Vestibule George ###-####. ok 3/2/2001 8:58:54 AM
|
Electrical Rough-In | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PART |
Marv Burrus
|
|
|
first floor area E canopy George Morris ###-####. lighting ele r/i. ok. 2/27/2001 11:20:40 AM
|
Electrical Rough-In | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | PART |
Marv Burrus
|
|
|
###-#### 1ST FLOOR LOBBY. ceiling ele r/i, recessed light fixtures. ok 2/21/2001 3:08:05 PM
|
Electrical Rough-In | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | PART |
Marv Burrus
|
|
|
###-#### 1ST FLOOR LOBBY. ceiling ele r/i, recessed light fixtures. ok 2/21/2001 3:08:05 PM
|
Electrical Rough-In | 2/16/2001 | 2/16/2001 | 2/16/2001 | P | PART |
Marv Burrus
|
|
|
###-####. 4th floor conference library r/i; 1st floor bathroom temp. occup., and cart wash room r/i. 2/16/2001 1:55:05 PM
|
Electrical Rough-In | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PART |
Marv Burrus
|
|
|
on the first second and third floor George ###-####. 1st recepticle outlet in column. 2nd & 3rd floor, bathrooms, storeage area. ele r/i. 2/9/2001 2:25:15 PM
|
Final | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PART |
Marv Burrus
|
|
|
Added by Inspector: 403 On 2/9/2001 2:27:20 PM pharmacy on 4th floor; temporary occupancy(phase 2).
|
Electrical Rough-In | 1/26/2001 | 1/29/2001 | 1/29/2001 | A | PART |
Marv Burrus
|
|
|
check ceiling 4th floor & check oxy storage outside george ###-####; also 1st floor bath and cart-room ceiling r/i.. 1/29/2001 9:59:31 AM
|
Electrical Rough-In | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | PART |
Marv Burrus
|
|
|
###-#### ceiling . 1st floor, exterior soffit lighting r/i. 4th floor storeage room ceiling r/i. 1/24/2001 2:13:37 PM
|
Electrical Rough-In | 1/11/2001 | 1/12/2001 | 1/12/2001 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 15:23:55. Contact: ###-####. 1st floor; ele r/i, repaired wall. 3rd floor; north inner wall ele r/i. 1/12/2001 2:10:36 PM
|
Electrical Rough-In | 12/28/2000 | 12/29/2000 | 12/29/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 09:28:06. Contact: ###-####. 4th floor; pharmacy ele r/i. 2nd floor; walls ele r/i. 12/29/2000 11:50:09 AM
|
Electrical Rough-In | 12/7/2000 | 12/8/2000 | 12/8/2000 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 09:52:41. Contact: ###-####.. main service; hot tub, a/c unit. 12/8/2000 10:43:41 AM
|
Electrical Rough-In | 12/1/2000 | 12/4/2000 | 12/4/2000 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/01/2000 at 13:18:09. Contact: ###-####. 8 parking lot lights; 7 sidewalk lights, (ballard) ele r/i. ok 12/4/2000 10:07:03 AM
|
Electrical Rough-In | 11/8/2000 | 11/9/2000 | 11/9/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/08/2000 at 08:52:31. Contact: ###-####. north stair-tower, ele r/i. 11/9/2000 5:17:06 PM
|
Electrical Rough-In | 10/25/2000 | 10/26/2000 | 10/26/2000 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 13:35:36. Contact: ###-####. ok cover rms 130,131,d1143,d1144,d1145,d1146 10/26/2000 5:18:41 PM
|
Electrical Rough-In | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 13:42:28. Contact: ###-####. p.v.c. groundwork; parking lot lighting. 10/20/2000 11:31:58 AM
|
Electrical Rough-In | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 13:42:28. Contact: ###-####. p.v.c. groundwork; parking lot lighting. 10/20/2000 11:31:58 AM
|
Electrical Rough-In | 9/25/2000 | 9/26/2000 | 9/26/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 11:11:40. Contact: ###-####. p.v.c. conduit groundwork for parking lot lighting r/i. 9/26/2000 5:53:32 PM
|
Electrical Rough-In | 6/13/2000 | 6/14/2000 | 6/14/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/13/2000 at 11:14:18. Contact: ###-####. Bonding; Pool ladder & rail cup-holders. 6/14/00 12:14:20 PM
|
Electrical Rough-In | 5/18/2000 | 5/19/2000 | 5/19/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 06:09:26. Contact: ###-####. bonding; pool area 5/22/00 11:35:41 AM
|
Final | 5/12/2000 | 5/15/2000 | 5/15/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 13:44:14. Contact: ###-####. Temp. occ.- 4th floor. 5/15/00 11:22:15 AM
|
Final | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 06:20:51. Contact: ###-####. Temp. occ.; areas' C & D, 2nd & 3rd floors. 5/12/00 12:02:48 PM
|
Electrical Rough-In | 5/9/2000 | 5/10/2000 | 5/10/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 09:56:58. Contact: ###-####. Ceiling ele. R/I; 10 rooms & corridor; 1st floor. 5/11/00 11:53:28 AM
|
Electrical Rough-In | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 06:12:37. Contact: ###-####. Ceiling Ele. R/I; 4th floor; 2nd floor serveout area; 3dr floor; meeting room/ 5/5/00 1:52:32 PM
|
Electrical Rough-In | 4/26/2000 | 4/27/2000 | 4/27/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 04/26/2000 at 12:42:44. Contact: ###-####. Ceiling R/I; 2nd & 3rd floor; patient rooms, corridor. 4/28/00 8:54:59 AM
|
Electrical Rough-In | 4/18/2000 | 4/18/2000 | 4/18/2000 | A | PART |
Marv Burrus
|
|
|
Ceiling Ele. R/I; areas A' & B'. 3rd floor. 2nd floor; corrections completed.
|
Final | 4/13/2000 | 4/14/2000 | 4/14/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 04/13/2000 at 07:59:01. Contact: ###-####. 2nd floor; areas 'A' & 'B'; temp. occ. 4/14/00 1:40:35 PM
|
Final | 4/11/2000 | 4/12/2000 | 4/12/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 04/11/2000 at 07:31:14. Contact: ###-####. 3rd floor; temp. occ. 4/12/00 11:49:41 AM
|
Electrical Rough-In | 4/4/2000 | 4/5/2000 | 4/5/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 04/04/2000 at 08:39:36. Contact: ###-####. Ceiling corridor Ele. R/I 4/6/00 2:55:59 PM
|
Final | 3/7/2000 | 3/8/2000 | 3/8/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/07/2000 at 07:50:22. Contact: ###-####. Temp. occ. on 1st & 4th floors (Green area on plans) only. 3/8/00 2:10:35 PM
|
Electrical Rough-In | 3/1/2000 | 3/2/2000 | 3/2/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 08:41:02. Contact: ###-####. 2nd & 4th floors; ceiling R/I, corridor & offices. 3/3/00 8:36:36 AM
|
Electrical Rough-In | 2/2/2000 | 2/4/2000 | 2/4/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 15:21:42. Contact: ###-####. Ceiling Ele. R/I; 1st floor; 2nd floor, room A2030 ceiling R/I. 2/4/00 11:54:54 AM
|
Electrical Rough-In | 2/1/2000 | 2/2/2000 | 2/2/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/01/2000 at 13:08:43. Contact: ###-####. 3rd floor area "b" X-ray room. 2/4/00 10:24:03 AM
|
Electrical Rough-In | 1/6/2000 | 1/6/2000 | 1/6/2000 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/06/2000 at 07:50:45. Contact: ###-####. 4th floor: Kitchen walls R/I.
|
Electrical Rough-In | 12/29/1999 | 12/29/1999 | 12/29/1999 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 09:33:56. Contact: ###-####. Ok part R/I Part kit. walls & west canopy ceiling.
|
Electrical Rough-In | 12/20/1999 | 12/22/1999 | 12/22/1999 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 10:34:11. Contact: ###-####. Lobby's Ele. R/I; 2nd, 3rd & 4th floors: 1st floor corridor.
|
Electrical Rough-In | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 08:38:52. Contact: ###-####. 1st floor entry wall; 4th floor O.R. rooms walls R/I.
|
Electrical Rough-In | 11/17/1999 | 11/18/1999 | 11/18/1999 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/17/1999 at 09:58:39. Contact: ###-####. 1st thru 4th core walls Ele. R/I.
|
Electrical Rough-In | 11/9/1999 | 11/12/1999 | 11/12/1999 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/09/1999 at 14:40:12. Contact: Mark ###-####. 2nd and 3rd floor; transformer R/I. 1st floor; 1 wall R/I.
|
Electrical Rough-In | 11/1/1999 | 11/2/1999 | 11/2/1999 | P | PART |
Marv Burrus
|
|
|
MARK ###-#### Motor control centers, 4th floor; elevator control cabinets 1st floor.
|
Electrical Rough-In | 10/21/1999 | 10/22/1999 | 10/22/1999 | A | PART |
Marv Burrus
|
|
|
PARTIAL R/I ###-#### Main service switch gear/meter; partial walls: 2nd, 3rd, & 4th floors.
|
Electrical Rough-In | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | PASS |
Marv Burrus
|
|
|
partial ###-####/K WALL PAT. RMS 2ND FLOOR PART
|
Electrical Rough-In | 9/13/1999 | 9/13/1999 | 9/13/1999 | P | PART |
Marv Burrus
|
|
|
WALLS R/I - 1ST, 2ND, 3RD FLOORS
|
INSP - Electrical Rough-In | 8/19/1999 | 8/20/1999 | 8/20/1999 | A | PART |
Marv Burrus
|
|
|
08/19/99 403 - mark ###-#### PARTIAL ELE R/I ON WALLS; 2ND, 3RD, AND STAIRWELL.
|
INSP - Electrical Rough-In | 8/11/1999 | 8/12/1999 | 8/12/1999 | A | PART |
Marv Burrus
|
|
|
08/11/99 403 - MARK ###-#### DRAINS POOL BONDING/ DRAINS.
|
INSP - Electrical Rough-In | 8/4/1999 | 8/4/1999 | 8/4/1999 | P | PART |
Marv Burrus
|
|
|
08/04/99 403 - MARV ###-#### PARTIAL R/I CONFERENCE ONLY; DISCUSSED SERVICE GEAR CLEARANCES.
|
INSP - Electrical Rough-In | 7/28/1999 | 7/29/1999 | 7/29/1999 | A | PART |
Marv Burrus
|
|
|
07/28/99 403 - PARTIAL R/I MARK ###-#### ELE R/I WALLS ON; 1ST, 2ND, AND 4TH FLOORS.
|
INSP - Electrical Rough-In | 7/8/1999 | 7/8/1999 | 7/8/1999 | | PART |
Marv Burrus
|
|
|
07/07/99 403 - wall r/i mark ###-#### WALLS R/I 1ST. THRU 4TH FLOORS. CENTER CORE AND PERIMETER.
|
INSP - Electrical Rough-In | 6/10/1999 | 6/11/1999 | 6/11/1999 | P | PART |
Marv Burrus
|
|
|
06/11/99 403 - ###-#### MARK//RI 2ND AND 3RD FLOOR CENTER CORE WALLS ELE R/I. OK
|
INSP - Electrical Rough-In | 5/19/1999 | 5/19/1999 | 5/19/1999 | P | PART |
Marv Burrus
|
|
|
05/19/99 403 - Mark ###-#### MECHANICAL ROOM ELE R/I.
|
INSP - Electrical Rough-In | 5/12/1999 | 5/13/1999 | 5/13/1999 | A | PART |
Marv Burrus
|
|
|
05/12/99 403 - Mark ###-#### 1ST., 3RD, & 4TH FLOORS CORE WALLS R/I. OK
|
INSP - Electrical Rough-In | 5/6/1999 | 5/7/1999 | 5/7/1999 | A | PART |
Marv Burrus
|
|
|
05/06/99 403 - mark ###-#### OUTER PERIMETER WALLS R/I; PARTIAL, FLOORS 1THRU4.
|
INSP - Electrical Rough-In | 4/21/1999 | 4/22/1999 | 4/22/1999 | A | PART |
Marv Burrus
|
|
|
04/21/99 403 - ###-#### MARK//PARTIAL RI 1st, 2nd, & 4th FLOORS ELE R/I WALLS; ALSO, POOL BONDING.
|
INSP - Electrical Rough-In | 3/30/1999 | 3/31/1999 | 3/31/1999 | A | PART |
Marv Burrus
|
|
|
03/30/99 403 - Mark ###-#### THERAPUTIC POOL BONDING; 2ND THRU 4TH FLOOR INTERIOR WALLS R/I. PARTIAL
|
INSP - Electrical Rough-In | 3/15/1999 | 3/16/1999 | 3/16/1999 | P | PART |
Marv Burrus
|
|
|
03/15/99 403 - MARK ###-#### IN-HOUSE INSPECTION, (MAIN SWITCH GEAR P.V.C.).
|
INSP - Electrical Rough-In | 12/8/1998 | 12/9/1998 | 12/9/1998 | A | PART |
Marv Burrus
|
|
|
MARK -###-#### -UNDERGROUND INSP pvc raceway-service gear. ok
|