Permit Information
Permit NumberELE98-03567
StatusFinaled
Name POWER PLUS INC
Site Address 600 N ROBBINS RD
Project NameIDAHO ELKS HOSPITAL
Customer Number 
ePlanReview 
Description
10-13-98 /ELKS REHABILITATION/ ADDITION-4 STORIES -ALL ELECTRICAL/FINAL CERTIFICATE OF VALUE $819,000/MLS address changed from 204 fort pl per jim rich 8/12/99 pe 3/29/00
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/12/20014/13/20014/13/2001PPASS
DetailsMarv Burrus
George ###-#### rb pedestal area e 1-4. phase 1 and phase 2 completed. ok. 4/13/2001 1:55:13 PM
Electrical Rough-In4/2/20014/3/20014/3/2001APASS
DetailsMarv Burrus
fourth floor lobby George ###-####. area'e' lobby; ceiling r/i. 4/3/2001 10:30:22 AM
Final4/2/20014/3/20014/3/2001APART
DetailsMarv Burrus
###-#### George on the first floor. 4th floor lobby area 'e'. temporary occupancy. 4/3/2001 10:33:40 AM 4/3/2001 10:34:05 AM
Electrical Rough-In3/30/20013/30/20013/30/2001PFAIL
DetailsMarv Burrus
###-####. 4th floor: ceiling tiles installed before ceiling inspection. informed contractor to have removed for reinspection. 3/30/2001 2:32:08 PM
Electrical Rough-In3/23/20013/23/20013/23/2001PPART
DetailsMarv Burrus
###-####. 1st floor lobby ceiling & wall r/i.
2nd & 3rd floor serve-out partial. 3/23/2001 2:48:26 PM
Electrical Rough-In3/13/20013/14/20013/14/2001APART
DetailsMarv Burrus
ceiling 2nd and 3rd E lobbies George ###-####. serve-outs, and sawthooth re-hab ceiling ele r/i. ok. 3/14/2001 10:54:13 AM
Electrical Rough-In3/1/20013/2/20013/2/2001APART
DetailsMarv Burrus
1st floor arear E r/i Vestibule George ###-####. ok 3/2/2001 8:58:54 AM
Electrical Rough-In2/27/20012/27/20012/27/2001PPART
DetailsMarv Burrus
first floor area E canopy George Morris ###-####. lighting ele r/i. ok. 2/27/2001 11:20:40 AM
Electrical Rough-In2/21/20012/21/20012/21/2001PPART
DetailsMarv Burrus
###-#### 1ST FLOOR LOBBY. ceiling ele r/i, recessed light fixtures. ok 2/21/2001 3:08:05 PM
Electrical Rough-In2/21/20012/21/20012/21/2001PPART
DetailsMarv Burrus
###-#### 1ST FLOOR LOBBY. ceiling ele r/i, recessed light fixtures. ok 2/21/2001 3:08:05 PM
Electrical Rough-In2/16/20012/16/20012/16/2001PPART
DetailsMarv Burrus
###-####. 4th floor conference library r/i; 1st floor bathroom temp. occup., and cart wash room r/i. 2/16/2001 1:55:05 PM
Electrical Rough-In2/9/20012/9/20012/9/2001PPART
DetailsMarv Burrus
on the first second and third floor George ###-####. 1st recepticle outlet in column. 2nd & 3rd floor, bathrooms, storeage area. ele r/i. 2/9/2001 2:25:15 PM
Final2/9/20012/9/20012/9/2001PPART
DetailsMarv Burrus
Added by Inspector: 403 On 2/9/2001 2:27:20 PM pharmacy on 4th floor; temporary occupancy(phase 2).
Electrical Rough-In1/26/20011/29/20011/29/2001APART
DetailsMarv Burrus
check ceiling 4th floor & check oxy storage outside george ###-####; also 1st floor bath and cart-room ceiling r/i.. 1/29/2001 9:59:31 AM
Electrical Rough-In1/24/20011/24/20011/24/2001PPART
DetailsMarv Burrus
###-#### ceiling . 1st floor, exterior soffit lighting r/i. 4th floor storeage room ceiling r/i. 1/24/2001 2:13:37 PM
Electrical Rough-In1/11/20011/12/20011/12/2001PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 01/11/2001 at 15:23:55. Contact: ###-####. 1st floor; ele r/i, repaired wall. 3rd floor; north inner wall ele r/i. 1/12/2001 2:10:36 PM
Electrical Rough-In12/28/200012/29/200012/29/2000PPASS
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 12/28/2000 at 09:28:06. Contact: ###-####. 4th floor; pharmacy ele r/i. 2nd floor; walls ele r/i. 12/29/2000 11:50:09 AM
Electrical Rough-In12/7/200012/8/200012/8/2000APASS
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 12/07/2000 at 09:52:41. Contact: ###-####.. main service; hot tub, a/c unit. 12/8/2000 10:43:41 AM
Electrical Rough-In12/1/200012/4/200012/4/2000APASS
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 12/01/2000 at 13:18:09. Contact: ###-####. 8 parking lot lights; 7 sidewalk lights, (ballard) ele r/i. ok 12/4/2000 10:07:03 AM
Electrical Rough-In11/8/200011/9/200011/9/2000PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 11/08/2000 at 08:52:31. Contact: ###-####. north stair-tower, ele r/i. 11/9/2000 5:17:06 PM
Electrical Rough-In10/25/200010/26/200010/26/2000PPASS
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 10/25/2000 at 13:35:36. Contact: ###-####. ok cover rms 130,131,d1143,d1144,d1145,d1146 10/26/2000 5:18:41 PM
Electrical Rough-In10/19/200010/20/200010/20/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 10/19/2000 at 13:42:28. Contact: ###-####. p.v.c. groundwork; parking lot lighting. 10/20/2000 11:31:58 AM
Electrical Rough-In10/19/200010/20/200010/20/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 10/19/2000 at 13:42:28. Contact: ###-####. p.v.c. groundwork; parking lot lighting. 10/20/2000 11:31:58 AM
Electrical Rough-In9/25/20009/26/20009/26/2000PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 09/25/2000 at 11:11:40. Contact: ###-####. p.v.c. conduit groundwork for parking lot lighting r/i. 9/26/2000 5:53:32 PM
Electrical Rough-In6/13/20006/14/20006/14/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 06/13/2000 at 11:14:18. Contact: ###-####. Bonding; Pool ladder & rail cup-holders. 6/14/00 12:14:20 PM
Electrical Rough-In5/18/20005/19/20005/19/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 05/18/2000 at 06:09:26. Contact: ###-####. bonding; pool area 5/22/00 11:35:41 AM
Final5/12/20005/15/20005/15/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 05/12/2000 at 13:44:14. Contact: ###-####. Temp. occ.- 4th floor. 5/15/00 11:22:15 AM
Final5/11/20005/12/20005/12/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 05/11/2000 at 06:20:51. Contact: ###-####. Temp. occ.; areas' C & D, 2nd & 3rd floors. 5/12/00 12:02:48 PM
Electrical Rough-In5/9/20005/10/20005/10/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 05/09/2000 at 09:56:58. Contact: ###-####. Ceiling ele. R/I; 10 rooms & corridor; 1st floor. 5/11/00 11:53:28 AM
Electrical Rough-In5/4/20005/5/20005/5/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 05/04/2000 at 06:12:37. Contact: ###-####. Ceiling Ele. R/I; 4th floor; 2nd floor serveout area; 3dr floor; meeting room/ 5/5/00 1:52:32 PM
Electrical Rough-In4/26/20004/27/20004/27/2000PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 04/26/2000 at 12:42:44. Contact: ###-####. Ceiling R/I; 2nd & 3rd floor; patient rooms, corridor. 4/28/00 8:54:59 AM
Electrical Rough-In4/18/20004/18/20004/18/2000APART
DetailsMarv Burrus
Ceiling Ele. R/I; areas A' & B'. 3rd floor. 2nd floor; corrections completed.
Final4/13/20004/14/20004/14/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 04/13/2000 at 07:59:01. Contact: ###-####. 2nd floor; areas 'A' & 'B'; temp. occ. 4/14/00 1:40:35 PM
Final4/11/20004/12/20004/12/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 04/11/2000 at 07:31:14. Contact: ###-####. 3rd floor; temp. occ. 4/12/00 11:49:41 AM
Electrical Rough-In4/4/20004/5/20004/5/2000PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 04/04/2000 at 08:39:36. Contact: ###-####. Ceiling corridor Ele. R/I 4/6/00 2:55:59 PM
Final3/7/20003/8/20003/8/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 03/07/2000 at 07:50:22. Contact: ###-####. Temp. occ. on 1st & 4th floors (Green area on plans) only. 3/8/00 2:10:35 PM
Electrical Rough-In3/1/20003/2/20003/2/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 03/01/2000 at 08:41:02. Contact: ###-####. 2nd & 4th floors; ceiling R/I, corridor & offices. 3/3/00 8:36:36 AM
Electrical Rough-In2/2/20002/4/20002/4/2000APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 02/02/2000 at 15:21:42. Contact: ###-####. Ceiling Ele. R/I; 1st floor; 2nd floor, room A2030 ceiling R/I. 2/4/00 11:54:54 AM
Electrical Rough-In2/1/20002/2/20002/2/2000PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 02/01/2000 at 13:08:43. Contact: ###-####. 3rd floor area "b" X-ray room. 2/4/00 10:24:03 AM
Electrical Rough-In1/6/20001/6/20001/6/2000PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 01/06/2000 at 07:50:45. Contact: ###-####. 4th floor: Kitchen walls R/I.
Electrical Rough-In12/29/199912/29/199912/29/1999PPASS
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 12/29/1999 at 09:33:56. Contact: ###-####. Ok part R/I Part kit. walls & west canopy ceiling.
Electrical Rough-In12/20/199912/22/199912/22/1999APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 12/20/1999 at 10:34:11. Contact: ###-####. Lobby's Ele. R/I; 2nd, 3rd & 4th floors: 1st floor corridor.
Electrical Rough-In12/2/199912/3/199912/3/1999APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 12/02/1999 at 08:38:52. Contact: ###-####. 1st floor entry wall; 4th floor O.R. rooms walls R/I.
Electrical Rough-In11/17/199911/18/199911/18/1999APART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 11/17/1999 at 09:58:39. Contact: ###-####. 1st thru 4th core walls Ele. R/I.
Electrical Rough-In11/9/199911/12/199911/12/1999PPART
DetailsMarv Burrus
Scheduled by a contractor via Hello! on 11/09/1999 at 14:40:12. Contact: Mark ###-####. 2nd and 3rd floor; transformer R/I. 1st floor; 1 wall R/I.
Electrical Rough-In11/1/199911/2/199911/2/1999PPART
DetailsMarv Burrus
MARK ###-#### Motor control centers, 4th floor; elevator control cabinets 1st floor.
Electrical Rough-In10/21/199910/22/199910/22/1999APART
DetailsMarv Burrus
PARTIAL R/I ###-#### Main service switch gear/meter; partial walls: 2nd, 3rd, & 4th floors.
Electrical Rough-In10/1/199910/4/199910/4/1999APASS
DetailsMarv Burrus
partial ###-####/K WALL PAT. RMS 2ND FLOOR PART
Electrical Rough-In9/13/19999/13/19999/13/1999PPART
DetailsMarv Burrus
WALLS R/I - 1ST, 2ND, 3RD FLOORS
INSP - Electrical Rough-In8/19/19998/20/19998/20/1999APART
DetailsMarv Burrus
08/19/99 403 - mark ###-#### PARTIAL ELE R/I ON WALLS; 2ND, 3RD, AND STAIRWELL.
INSP - Electrical Rough-In8/11/19998/12/19998/12/1999APART
DetailsMarv Burrus
08/11/99 403 - MARK ###-#### DRAINS POOL BONDING/ DRAINS.
INSP - Electrical Rough-In8/4/19998/4/19998/4/1999PPART
DetailsMarv Burrus
08/04/99 403 - MARV ###-#### PARTIAL R/I CONFERENCE ONLY; DISCUSSED SERVICE GEAR CLEARANCES.
INSP - Electrical Rough-In7/28/19997/29/19997/29/1999APART
DetailsMarv Burrus
07/28/99 403 - PARTIAL R/I MARK ###-#### ELE R/I WALLS ON; 1ST, 2ND, AND 4TH FLOORS.
INSP - Electrical Rough-In7/8/19997/8/19997/8/1999 PART
DetailsMarv Burrus
07/07/99 403 - wall r/i mark ###-#### WALLS R/I 1ST. THRU 4TH FLOORS. CENTER CORE AND PERIMETER.
INSP - Electrical Rough-In6/10/19996/11/19996/11/1999PPART
DetailsMarv Burrus
06/11/99 403 - ###-#### MARK//RI 2ND AND 3RD FLOOR CENTER CORE WALLS ELE R/I. OK
INSP - Electrical Rough-In5/19/19995/19/19995/19/1999PPART
DetailsMarv Burrus
05/19/99 403 - Mark ###-#### MECHANICAL ROOM ELE R/I.
INSP - Electrical Rough-In5/12/19995/13/19995/13/1999APART
DetailsMarv Burrus
05/12/99 403 - Mark ###-#### 1ST., 3RD, & 4TH FLOORS CORE WALLS R/I. OK
INSP - Electrical Rough-In5/6/19995/7/19995/7/1999APART
DetailsMarv Burrus
05/06/99 403 - mark ###-#### OUTER PERIMETER WALLS R/I; PARTIAL, FLOORS 1THRU4.
INSP - Electrical Rough-In4/21/19994/22/19994/22/1999APART
DetailsMarv Burrus
04/21/99 403 - ###-#### MARK//PARTIAL RI 1st, 2nd, & 4th FLOORS ELE R/I WALLS; ALSO, POOL BONDING.
INSP - Electrical Rough-In3/30/19993/31/19993/31/1999APART
DetailsMarv Burrus
03/30/99 403 - Mark ###-#### THERAPUTIC POOL BONDING; 2ND THRU 4TH FLOOR INTERIOR WALLS R/I. PARTIAL
INSP - Electrical Rough-In3/15/19993/16/19993/16/1999PPART
DetailsMarv Burrus
03/15/99 403 - MARK ###-#### IN-HOUSE INSPECTION, (MAIN SWITCH GEAR P.V.C.).
INSP - Electrical Rough-In12/8/199812/9/199812/9/1998APART
DetailsMarv Burrus
MARK -###-#### -UNDERGROUND INSP pvc raceway-service gear. ok