Final | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | CANC |
Marv Burrus
|
|
|
Inspected by insp. #412 and passed on 12/2/99.
|
Final | 12/2/1999 | 12/2/1999 | 12/2/1999 | P | PASS |
Marv Burrus
|
|
|
###-#### Per. Occ. Core & shell final.
|
Final | 9/20/1999 | 9/21/1999 | 9/20/1999 | A | PART |
Jack Frank
|
|
|
###-#### temp occupancy for shell and core ok
|
INSP - Electrical Rough-In | 8/11/1999 | 8/12/1999 | 8/12/1999 | A | PASS |
Jack Frank
|
|
|
08/12/99 315 - 2,3,4th floor lobbies amy ###-#### ok
|
INSP - Electrical Rough-In | 7/30/1999 | 8/2/1999 | 8/2/1999 | A | PART |
Jack Frank
|
|
|
08/02/99 315 - reinspection of lobby floor ###-#### ..trans jms.. ok
|
INSP - Electrical Rough-In | 7/29/1999 | 7/30/1999 | 7/30/1999 | A | FAIL |
Jim Schmer
|
|
|
amy--###-#### r/i-lobby area ..slab poured already, called contractor..jm.s.
|
INSP - Electrical Rough-In | 6/29/1999 | 6/30/1999 | 7/1/1999 | P | PART |
Jack Frank
|
|
|
06/30/99 315 - Amy ###-#### ..trans jms.. p/s ok u/g n
|
INSP - Electrical Rough-In | 6/15/1999 | 6/16/1999 | 6/16/1999 | A | PART |
Marv Burrus
|
|
|
06/15/99 403 - ###-#### R-I 3RD FLOOR, 4TH FLOOR WALLS ELE R/I.
|
INSP - Electrical Rough-In | 6/3/1999 | 6/3/1999 | 6/3/1999 | | PART |
Marv Burrus
|
|
|
06/02/99 403 - r/i walls rick ###-#### 1st floor lobby BATHROOM WALLS, 1ST. AND 2ND. FLOORS ELE R/I.
|
INSP - Electrical Rough-In | 2/12/1999 | 2/16/1999 | 2/16/1999 | A | PASS |
Jim Schmer
|
|
|
partial ###-#### call before inspect Amy // inspect underground, inspect underground in electrical room
|
INSP - Electrical Rough-In | 2/12/1999 | 2/12/1999 | 2/12/1999 | P | PASS |
Jim Schmer
|
|
|
underground (outside - feeders from xfer.)
|