Final | 11/24/1999 | 11/29/1999 | 11/24/1999 | P | CANC |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/24/1999 at 07:51:32. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/24/1999 at 08:00:19.
|
Electrical Rough-In | 10/23/1999 | 10/25/1999 | 10/25/1999 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 10/23/1999 at 08:48:45. Contact: ###-####. 4th floor and Ped's. ICU
|
Electrical Rough-In | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | CANC |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 09/22/1999 at 15:49:17. Contact: ###-####.
|
Final | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | PASS |
Marv Burrus
|
|
|
this was called in for r/i should have been a final.
|
INSP - Electrical Rough-In | 8/10/1999 | 8/10/1999 | 8/10/1999 | P | PART |
Marv Burrus
|
|
|
08/10/99 403 - Scheduled by Hello!. Contact phone is [3860856]. 4TH FLOOR ROOM -PEDIATRICS ELE R/I WALLS.
|
INSP - Electrical Rough-In | 7/23/1999 | 7/23/1999 | 7/23/1999 | P | PART |
Marv Burrus
|
|
|
07/23/99 403 - Scheduled by Hello!. Contact phone is [3860856]. PEC'S/ICU ISOLATION ROOM.
|
INSP - Electrical Rough-In | 3/17/1999 | 3/17/1999 | 3/17/1999 | P | PASS |
Marv Burrus
|
|
|
03/17/99 403 - larry ###-#### 4th FLOOR-EAST/END STORAGE ROOM R/I.
|