INSP - Final | 6/9/1999 | 6/9/1999 | 6/9/1999 | P | PASS |
Marv Burrus
|
|
|
06/09/99 403 - ###-#### LYNN//FINAL ..re-inps - 2 grd rds at out buld. a cond to out bld. CORRECTIONS COMPLETED.
|
INSP - Final | 6/7/1999 | 6/7/1999 | 6/7/1999 | P | FAIL |
Pat Lass
|
|
|
06/07/99 336 - 2 ground rods and #6 identified
|
INSP - Final | 6/3/1999 | 6/3/1999 | 6/3/1999 | | FAIL |
Pat Lass
|
|
|
06/03/99 336 - corrections not made job notfinished
|
INSP - Final | 6/2/1999 | 6/3/1999 | 6/3/1999 | A | FAIL |
Pat Lass
|
|
|
06/04/99 336 - not finished SLB with #4 phone wire accross hot tub
|
INSP - Final | 5/28/1999 | 6/1/1999 | 6/1/1999 | A | FAIL |
Jack Frank
|
|
|
06/01/99 315 - ###-#### LYNN//FINAL ..tran jms.. cor. posted 210-8 gfci protection back outlet, 680-22 bonding for spa sh meet intent of NEC
|
INSP - Electrical Rough-In | 4/19/1999 | 4/20/1999 | 4/20/1999 | A | PASS |
Jack Frank
|
|
|
04/20/99 315 - ###-####//RI REINSPECT OK P/S AND RES. REM
|
INSP - Electrical Rough-In | 4/16/1999 | 4/19/1999 | 4/19/1999 | P | FAIL |
Jack Frank
|
|
|
04/19/99 315 - Lynn ###-#### ..trans jms.. cor. posted 210-52 (a) 250-50 hit water 5 ft of where it enters u bolt o kit timer for whole house fan
|