Final | 11/5/1999 | 11/5/1999 | 11/5/1999 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/05/1999 at 11:03:32. Contact: ###-####. Final ok.
|
Final | 11/3/1999 | 11/3/1999 | 11/3/1999 | P | PART |
Pat Lass
|
|
|
partial final judith ###-#### T/O ok button up
|
Electrical Rough-In | 10/27/1999 | 10/27/1999 | 10/27/1999 | P | PASS |
Joe Ray
|
|
|
###-#### all ceiling except kitchen (JMS)
|
Permanent Service | 10/14/1999 | 10/14/1999 | 10/14/1999 | P | PART |
Pat Lass
|
|
|
JUDITH ###-#### PER SERVICE & CEILING P/S ok
|
Electrical Rough-In | 9/29/1999 | 9/30/1999 | 9/30/1999 | A | PART |
Jack Frank
|
|
|
Judith ###-####; underground (JMS) (Pat gave ok to cover some underground already) r/I for u/g ok
|
Electrical Rough-In | 9/15/1999 | 9/15/1999 | 9/15/1999 | P | PART |
Pat Lass
|
|
|
CEILING AND SOFIT
|
INSP - Electrical Rough-In | 8/27/1999 | 8/27/1999 | 8/27/1999 | P | PART |
Pat Lass
|
|
|
08/27/99 336 - ok
|
INSP - Electrical Rough-In | 6/2/1999 | 6/2/1999 | 6/2/1999 | | PASS |
Pat Lass
|
|
|
06/02/99 336 - ok
|
INSP - Electrical Rough-In | 5/26/1999 | 5/26/1999 | 5/26/1999 | P | PART |
Pat Lass
|
|
|
05/26/99 336 - ok
|