Final | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | PASS |
Jack Frank
|
|
|
mark ###-#### fn d (JMS) final ok card signed
|
Final | 9/21/1999 | 9/22/1999 | 9/22/1999 | A | PART |
Jack Frank
|
|
|
mark ###-#### (trans jms) temp occ. Needs gfci protection outlet in bathroom done by Jray
|
Electrical Rough-In | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | PASS |
Joe Ray
|
|
|
ceiling r/i ok
|
INSP - Electrical Rough-In | 8/5/1999 | 8/5/1999 | 8/6/1999 | P | PASS |
Jack Frank
|
|
|
08/05/99 315 - ###-#### ok
|
INSP - Electrical Rough-In | 8/3/1999 | 8/3/1999 | 8/3/1999 | P | PART |
Jack Frank
|
|
|
08/03/99 315 - MARK ###-#### CONSULTATION ok met with Mike
|
INSP - Electrical Rough-In | 7/30/1999 | 7/30/1999 | 7/30/1999 | P | PART |
Pat Lass
|
|
|
Mark ###-####
|
INSP - Electrical Rough-In | 7/22/1999 | 7/22/1999 | 7/22/1999 | P | PART |
Pat Lass
|
|
|
07/22/99 336 - MARK ###-#### out side walls no wire pulled
|
INSP - Electrical Rough-In | 7/15/1999 | 7/15/1999 | 7/15/1999 | P | PART |
Pat Lass
|
|
|
07/15/99 336 - MARK ###-####(SHOP) UNDERGROUND called about patient care Underground in metal raceways.
|