Final | 5/22/2000 | 5/22/2000 | 5/22/2000 | P | PASS |
Jack Frank
|
|
|
###-####
|
Electrical Rough-In | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 13:41:41. Contact: ###-####. 3rd floor restrooms 3/22/00 1:01:48 PM
|
Electrical Rough-In | 3/20/2000 | 3/21/2000 | 3/21/2000 | A | PASS |
Pat Lass
|
|
|
first floor bathroom wall r/i Kelly Smith ###-#### 1st floor rest rooms ok R/I. 3/21/00 4:20:23 PM
|
Permanent Service | 3/2/2000 | 3/3/2000 | 3/3/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 11:49:45. Contact: ###-####. P/S U/G N ok. 3/3/00 4:43:00 PM
|
Electrical Rough-In | 1/5/2000 | 1/5/2000 | 1/5/2000 | P | PART |
Jack Frank
|
|
|
wall r/i for 1st flr elec room pager ###-####. R/I ok.
|
Electrical Rough-In | 12/16/1999 | 12/17/1999 | 12/17/1999 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 12:38:55. Contact: ###-####. U/G trench ok.
|
INSP - Electrical Rough-In | 8/2/1999 | 8/2/1999 | 8/2/1999 | P | PART |
Jack Frank
|
|
|
08/02/99 315 - UFER GROUND JESSIE ###-#### ok
|
INSP - Final | 7/27/1999 | 7/27/1999 | 7/27/1999 | P | FAIL |
Jack Frank
|
|
|
07/27/99 315 - JESSIE ###-#### TEMP. POLE AS SOON AS POSSIBLE CALLED NEED TO MEET WITH CONTRACTOR AND NEEDS PERMIT FOR T/S
|
INSP - Electrical Rough-In | 7/22/1999 | 7/23/1999 | 7/23/1999 | A | PART |
Jack Frank
|
|
|
07/23/99 315 - underground John ###-#### OK
|
INSP - Electrical Rough-In | 7/21/1999 | 7/22/1999 | 7/22/1999 | A | FAIL |
Jack Frank
|
|
|
07/22/99 315 - Scheduled by Hello!. COVERED BEFORE INSPECTION U/G CALLED
|