Final | 9/21/1999 | 9/21/1999 | 9/21/1999 | P | PASS |
Marv Burrus
|
|
|
###-#### Pump house ok
|
INSP - Electrical Rough-In | 8/24/1999 | 8/24/1999 | 8/25/1999 | P | NR |
Jack Frank
|
|
|
08/24/99 315 - ###-####---r/i & ser--warm springs golf course-new pump h ..trans jms..
|
INSP - Electrical Rough-In | 8/23/1999 | 8/23/1999 | 8/23/1999 | P | CANC |
Marv Burrus
|
|
|
steve ###-#### CONTRACTOR WILL RESCHEDULE.
|
INSP - Electrical Rough-In | 8/23/1999 | 8/23/1999 | 8/23/1999 | P | CANC |
Jack Frank
|
|
|
###-#### steve
|
INSP - Electrical Rough-In | 7/23/1999 | 7/23/1999 | 7/23/1999 | P | PART |
Marv Burrus
|
|
|
Steve ###-#### UFER GROUNDING CONDUCTOR INSPECTION. OK
|