Final | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 15:51:02. Contact: ###-####. ok 11/3/2000 11:53:22 AM
|
Final | 11/2/2000 | 11/2/2000 | 11/2/2000 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 09:16:49. Contact: ###-####. conference ok 11/3/2000 7:52:13 AM
|
Final | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 08:50:58. Contact: ###-####. job is not ready
10/31/2000 8:01:09 AM
|
Electrical Rough-In | 3/7/2000 | 3/8/2000 | 3/8/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/07/2000 at 13:26:13. Contact: ###-####. R/I ok. 3/9/00 9:14:05 AM
|