Information based on query as of Saturday, July 20, 2024.
Permit Information
Permit NumberELE99-02956
StatusFinaled
Name MULTI STATE ELECTRIC
Site Address 1626 S ORCHARD ST
Project NameHILLCREST (FOUNDATIO
Customer Number 
ePlanReview 
Description
ELECTRICAL WORK-GROUND R/I & TRIM COMPLETE. $25992.00 8/20/99 SRK
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/23/199912/23/199912/23/1999PPASS
DetailsPat Lass
Scheduled by a contractor via Hello! on 12/23/1999 at 07:55:39. Contact: ###-####. Final ok.
Final12/22/199912/22/199912/22/1999PFAIL
DetailsPat Lass
Scheduled by a contractor via Hello! on 12/22/1999 at 09:22:05. Contact: ###-####. Bond pole base.
Final12/3/199912/3/199912/3/1999APART
DetailsPat Lass
Scheduled by a contractor via Hello! on 12/03/1999 at 05:36:29. Contact: ###-####. T/O ok fuel tank & outside lights pending.
Final12/2/199912/2/199912/2/1999PFAIL
DetailsPat Lass
Scheduled by a contractor via Hello! on 12/02/1999 at 07:59:53. Contact: ###-####. temp occ Not ready.
Electrical Rough-In11/23/199911/24/199911/24/1999APASS
DetailsPat Lass
Scheduled by a contractor via Hello! on 11/23/1999 at 23:13:51. Contact: ###-####. R/I ceiling ok.
Permanent Service11/23/199911/24/199911/24/1999AFAIL
DetailsPat Lass
Scheduled by a contractor via Hello! on 11/23/1999 at 23:14:26. Contact: ###-####. P/S not grounded properly.
Permanent Service11/24/199911/24/199911/24/1999PPASS
DetailsPat Lass
Scheduled by a contractor via Hello! on 11/24/1999 at 10:06:07. Contact: ###-####. P/S ok.
Electrical Rough-In11/18/199911/19/199911/19/1999AFAIL
DetailsPat Lass
Scheduled by a contractor via Hello! on 11/18/1999 at 22:28:14. Contact: ###-####. Supports.
Electrical Rough-In11/17/199911/18/199911/18/1999AFAIL
DetailsPat Lass
CEILING BECKY ###-#### Support of m/c and flex ground wires to switches.
Electrical Rough-In10/27/199910/27/199910/27/1999PPASS
DetailsJoe Ray
Scheduled by a contractor via Hello! on 10/27/1999 at 08:16:48. Contact: ###-####. (call Pat on this!!!)(JMS)
Electrical Rough-In10/22/199910/26/199910/26/1999AFAIL
DetailsJack Frank
Scheduled by a contractor via Hello! on 10/22/1999 at 11:52:37. Contact: ###-####. (JMS) Called cor. Posted $42.00 reinspection fee due posted Pat Lass's corrections not made.
Electrical Rough-In10/19/199910/20/199910/20/1999AFAIL
DetailsPat Lass
Scheduled by a contractor via Hello! on 10/19/1999 at 17:59:18. Contact: ###-####. Protection of MC cable not finished
Electrical Rough-In10/11/199910/12/199910/12/1999APART
DetailsPat Lass
partial r/I front officeScheduled by a contractor via Hello! on 10/11/1999 at 07:35:54. Contact: ###-####.
Electrical Rough-In10/7/199910/8/199910/8/1999AFAIL
DetailsJack Frank
Scheduled by a contractor via Hello! on 10/07/1999 at 17:53:47. Contact: ###-####. (JMS) Not ready and needs to support MC cable and 300-4 1 1/4 inches from edge of framing member to edge of cable.
INSP - Electrical Rough-In8/23/19998/23/19998/23/1999PPART
DetailsPat Lass
08/23/99 336 - becky--###-#### ground work insp ok