Final | 11/5/1999 | 11/8/1999 | 11/8/1999 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/05/1999 at 12:56:09. Contact: ###-####.
|
Final | 11/4/1999 | 11/4/1999 | 11/4/1999 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/04/1999 at 10:13:37. Contact: ###-####. Not ready.
|
INSP - Electrical Rough-In | 8/30/1999 | 8/31/1999 | 8/31/1999 | A | PASS |
Joe Ray
|
|
|
08/31/99 404 - ZACK ###-####
|