Final | 3/29/2000 | 3/30/2000 | 3/30/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/29/2000 at 13:11:35. Contact: ###-####. Final ok. 3/30/00 2:22:23 PM
|
Electrical Rough-In | 2/15/2000 | 2/16/2000 | 2/16/2000 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 02/15/2000 at 13:25:35. Contact: ###-####.
|
Permanent Service | 2/7/2000 | 2/7/2000 | 2/7/2000 | P | PASS |
Jack Frank
|
|
|
Martin ###-#### p/s u/g n ok
|
Electrical Rough-In | 11/1/1999 | 11/1/1999 | 11/1/1999 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/01/1999 at 08:55:20. Contact: ###-####. U/G conduit R/I ok.
|