Final | 12/21/1999 | 12/22/1999 | 12/22/1999 | A | PASS |
Marv Burrus
|
|
|
Chris ###-#### Correction completed.
|
Final | 12/20/1999 | 12/21/1999 | 12/21/1999 | A | FAIL |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 11:46:13. Contact: ###-####. NEC: 2108 (a) (3) outdoor GFCI recepticles. NEC: 370-20. Boxes shall be flush with combustible material called contractor.
|
INSP - Electrical Rough-In | 8/31/1999 | 8/31/1999 | 8/31/1999 | P | PASS |
Marv Burrus
|
|
|
REINSPECTION ON R/I CHRIS ###-#### GROUNDING OF SWITCHES COMPLETED. OK
|
INSP - Electrical Rough-In | 8/30/1999 | 8/30/1999 | 8/30/1999 | P | PASS |
Marv Burrus
|
|
|
08/30/99 403 - LATE PM PLEASE. CHRIS ###-#### PERM/SVC; ELE R/I
|