Final | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/20/2000 at 11:24:58. Contact: ###-####. Final ok 3/21/00 9:33:35 AM
|
Electrical Rough-In | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | PASS |
Joe Ray
|
|
|
###-#### jesse
|
Final | 3/6/2000 | 3/7/2000 | 3/7/2000 | A | PART |
Pat Lass
|
|
|
###-#### jesse T/O ok bond building steels straping and some back ordered lights. 3/7/00 1:27:21 PM
|
Electrical Rough-In | 2/17/2000 | 2/18/2000 | 2/18/2000 | P | PASS |
Pat Lass
|
|
|
###-#### R/I ok. 2/22/00 10:09:05 AM
|
Permanent Service | 2/15/2000 | 2/16/2000 | 2/16/2000 | A | PASS |
Pat Lass
|
|
|
###-#### R/I ok. 2/16/00 1:26:27 PM
|
Electrical Rough-In | 1/31/2000 | 2/1/2000 | 2/1/2000 | A | PART |
Pat Lass
|
|
|
Jessie; ###-####. wall r\i ok 2/1/00 2:09:57 PM
|
Electrical Rough-In | 10/13/1999 | 10/14/1999 | 10/14/1999 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/13/1999 at 15:02:04. Contact: ###-####. Partial R/I o
|
Electrical Rough-In | 9/29/1999 | 9/30/1999 | 9/30/1999 | A | PART |
Jack Frank
|
|
|
Jesse ###-#### (JMS) ok
|
Rough-In Permanent Service | 9/29/1999 | 9/29/1999 | 9/29/1999 | P | PART |
Pat Lass
|
|
|
FOR ELE ROOM-ON UFFER GROUND-JESSIE ###-#### Partial R/I ok
|
Electrical Rough-In | 9/13/1999 | 9/13/1999 | 9/13/1999 | P | PASS |
Pat Lass
|
|
|
PARTIAL U/G OK
|
Electrical Rough-In | 9/8/1999 | 9/8/1999 | 9/8/1999 | P | PART |
Jack Frank
|
|
|
this should be the r/i permit not the temp pole permit. jessie ###-####; 9/8 Partial R/I underground for parking lot lights 2 locations. jrb
|
INSP - Electrical Rough-In | 9/2/1999 | 9/2/1999 | 9/2/1999 | P | FAIL |
Pat Lass
|
|
|
09/02/99 336 - no disconnect and lots more
|