Final | 10/7/1999 | 10/7/1999 | 10/7/1999 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 10/07/1999 at 10:29:36. Contact: ###-####. P/s o/h n ok
|
Final | 9/28/1999 | 9/29/1999 | 9/29/1999 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 09/28/1999 at 15:34:47. Contact: ###-####. Service panel/meter. Corrections completed- no code violations retained (SEC existing) per JSCHMER
|
Final | 9/21/1999 | 9/21/1999 | 9/21/1999 | P | FAIL |
Jack Frank
|
|
|
###-#### reinspect contractor needs to meet with Mburrus, needs to remove bond screw in sub panel needs equip. grd kit in sub panel, other building drop needs proper clearence over car port no violations to be retained called
|
INSP - Final | 9/2/1999 | 9/2/1999 | 9/2/1999 | P | FAIL |
Jack Frank
|
|
|
09/02/99 315 - SERVICE UPGRADE, LOCATED IN CARPORT. JUDITH ###-#### ..tr
|