Final | 12/1/1999 | 12/2/1999 | 12/2/1999 | A | PASS |
Joe Ray
|
|
|
TONY ###-#### ###-#### CELL REINSPECTION
|
Final | 11/29/1999 | 12/1/1999 | 12/1/1999 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/29/1999 at 09:20:45. Contact: ###-####. Locked- called no answer.
|
Electrical Rough-In | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/27/1999 at 19:09:37. Contact: ###-####. Concrete electrode ok for cover
|
Electrical Rough-In | 10/25/1999 | 10/25/1999 | 10/25/1999 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/25/1999 at 06:11:03. Contact: ###-####. R/I ok P/S needs concrete electrode
|
Electrical Rough-In | 10/20/1999 | 10/21/1999 | 10/20/1999 | A | CANC |
Joe Ray
|
|
|
TONY-- HOMEOWNER-- SHOP IN BACK 3210918 Disp set to [CANC] by a contractor via Hello! on 10/20/1999 at 20:34:38.
|