Final | 11/4/1999 | 11/5/1999 | 11/5/1999 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/04/1999 at 15:24:33. Contact: ###-####. Final ok
|
Final | 10/29/1999 | 10/29/1999 | 10/29/1999 | A | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/29/1999 at 07:01:26. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/29/1999 at 07:02:07.
|
Final | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/29/1999 at 07:03:06. Contact: ###-####. Supports
|
Electrical Rough-In | 10/4/1999 | 10/4/1999 | 10/4/1999 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/04/1999 at 10:25:31. Contact: ###-####. PARTIAL R/I OK
|
Electrical Rough-In | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | PART |
Jack Frank
|
|
|
KF ELectric ###-#### (JMS - call when going here) walls ok & partial ceiling back half
|