Final | 10/4/2000 | 10/5/2000 | 10/5/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/04/2000 at 15:54:18. Contact: ###-####. ok 10/5/2000 12:28:37 PM
|
Final | 8/16/2000 | 8/17/2000 | 8/17/2000 | P | FAIL |
Joe Ray
|
|
|
see linda or jim if problems not ready 8/18/2000 7:25:26 AM
|
Permanent Service | 8/16/2000 | 8/17/2000 | 8/17/2000 | P | PASS |
Joe Ray
|
|
|
see linda or Jim if problems
|
Electrical Rough-In | 10/19/1999 | 10/19/1999 | 10/19/1999 | P | PART |
Marv Burrus
|
|
|
tom-- ###-#### r/I Corrections completed; perm./svc.; Ele. R/I
|
Electrical Rough-In | 10/14/1999 | 10/15/1999 | 10/15/1999 | A | FAIL |
Jack Frank
|
|
|
gonzales--- ###-#### r/i --late if possible Correction posted, called 250-104 bond water and gas pipe 300-4 nail plates & 1 1/4 from edge of stud to ENT, over 360 of bends, and shall have all makeup done at time of R/I
|