Final | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 13:34:52. Contact: ###-####. Parking lot lighting. 2/14/00 2:08:27 PM
|
Final | 2/8/2000 | 2/9/2000 | 2/9/2000 | A | 403 |
Marv Burrus
|
|
|
brad --###-#### for conf insp-- conference street lights grounding.
|
Final | 2/1/2000 | 2/1/2000 | 2/3/2000 | P | FAIL |
Marv Burrus
|
|
|
Brenda; ###-####. Shall install grounding electrode @ street lights. 2/4/00 10:20:05 AM
|
Final | 1/31/2000 | 1/31/2000 | 1/31/2000 | P | CANC |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 10:12:13. Contact: ###-####. contractor unsure of inspection requesting will reschedule 2/1/00 8:56:38 AM
|