Final | 2/17/2000 | 2/17/2000 | 2/24/2000 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 10:46:23. Contact: ###-####. Bld. #4; completed. 2/24/00 1:25:02 PM
|
Electrical Rough-In | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | PASS |
Marv Burrus
|
|
|
r/i on 2 and 3rd floor and a p/s jim ###-#### 2nd & 3rd floor; bldg. #4 Ele. R/I; perm/svc. Main switch gear.
|
Electrical Rough-In | 10/8/1999 | 10/11/1999 | 10/11/1999 | A | PART |
Marv Burrus
|
|
|
###-#### bld # 4 ; 1st floor , ele r/I
|