Final | 1/10/2000 | 1/11/2000 | 1/11/2000 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/10/2000 at 17:18:03. Contact: ###-####. Final ok.
|
Electrical Rough-In | 1/5/2000 | 1/6/2000 | 1/6/2000 | A | PART |
Pat Lass
|
|
|
upher ground Alan ###-####. "U"fer ok for concrete house finaled inside.
|
Final | 12/7/1999 | 12/7/1999 | 12/7/1999 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/07/1999 at 11:12:04. Contact: ###-####.---FOR ACCESS ON FRONT DOOR CODE----- EHC No address sign posted to remove shoes called could not inspect job until access is given.
|
Electrical Rough-In | 9/29/1999 | 9/30/1999 | 9/30/1999 | A | PART |
Joe Ray
|
|
|
###-#### (JMS) R/I P/S ok
|