Final | 2/11/2000 | 2/11/2000 | 2/11/2000 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/11/2000 at 09:36:16. Contact: ###-####. Final ok. 2/14/00 12:01:25 PM
|
Final | 2/10/2000 | 2/10/2000 | 2/10/2000 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 08:11:39. Contact: ###-####. Correction posted see 315 for details.
|
Permanent Service | 12/14/1999 | 12/17/1999 | 12/17/1999 | A | PASS |
Jack Frank
|
|
|
###-#### P/S U/G N rec. called ID Power.
|
Electrical Rough-In | 10/4/1999 | 10/4/1999 | 10/11/1999 | P | PASS |
Jack Frank
|
|
|
leon-- ###-#### r/i Res. Rem. R/I ok
|