Final | 9/12/2000 | 9/12/2000 | 9/12/2000 | P | PASS |
Mike Kinnear
|
|
|
HAROLD ###-#### CALL WHEN YOU ARRIVE-HAROLD IS UP THE HILL FROM THERE-- FN INSP Ok final 9/13/00 3:53:18 PM
|
Permanent Service | 8/29/2000 | 8/30/2000 | 8/30/2000 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 14:34:03. Contact: ###-####. P/S u/G N ok 8/30/00 5:11:43 PM
|
Rough-In Permanent Service | 8/29/2000 | 8/29/2000 | 8/29/2000 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 11:07:54. Contact: ###-####. No address could not locate got answering mach. 9/5/00 12:03:31 PM
|
Electrical Rough-In | 1/19/2000 | 1/20/2000 | 1/20/2000 | P | PASS |
Jack Frank
|
|
|
HAROLD-- ###-#### R/I
|