Final | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 15:49:57. Contact: ###-####.
|
Final | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/19/1999 at 12:52:15. Contact: ###-####. Ceiling R/I ok.
|
Electrical Rough-In | 10/12/1999 | 10/13/1999 | 10/13/1999 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/12/1999 at 08:51:52. Contact: ###-####. R/I walls second floor.
|