Final | 11/9/1999 | 11/10/1999 | 11/10/1999 | A | PASS |
Pat Lass
|
|
|
PHIL ###-#### Final ok.
|
Final | 11/4/1999 | 11/4/1999 | 11/4/1999 | P | FAIL |
Pat Lass
|
|
|
phil ###-#### re-insp fn floor receps
|
Final | 11/1/1999 | 11/1/1999 | 11/1/1999 | P | FAIL |
Pat Lass
|
|
|
###-#### Floor receps not covered
|
Electrical Rough-In | 10/19/1999 | 10/19/1999 | 10/19/1999 | P | PASS |
Pat Lass
|
|
|
phil ###-#### cell r/i R/I ok
|
Electrical Rough-In | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | FAIL |
Pat Lass
|
|
|
reinspection phil ###-#### Corrections not made loose connector into floor box.
|
Electrical Rough-In | 10/14/1999 | 10/14/1999 | 10/14/1999 | P | FAIL |
Pat Lass
|
|
|
PHIL ###-#### Protect and support wiring methods open floor for inspection
|