Final | 11/12/1999 | 11/12/1999 | 11/12/1999 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/12/1999 at 08:24:05. Contact: ###-####. Final ok.
|
Final | 11/8/1999 | 11/9/1999 | 11/9/1999 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/08/1999 at 13:06:08. Contact: ###-####. GFCI protect all receps within 20ft.
|
Final | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | PART |
Pat Lass
|
|
|
Ron Ely for Spa ###-#### ASAP Bonding ok
|