Final | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PASS |
Pat Lass
|
|
|
###-####
|
Final | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Pat Lass
|
|
|
Greg Oyama ###-#### Location of lights and recep length and listing of cords box flush recep secure. 4/26/00 12:04:22 PM
|
Permanent Service | 1/25/2000 | 1/26/2000 | 1/26/2000 | A | PASS |
Pat Lass
|
|
|
###-#### P/S Ok. 1/26/00 2:40:48 PM
|
Permanent Service | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | FAIL |
Pat Lass
|
|
|
###-#### Service not grounded. 1/25/00 12:00:16 PM
|
Electrical Rough-In | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 12:12:41. Contact: ###-####. R/I ok.
|
Electrical Rough-In | 11/22/1999 | 11/23/1999 | 11/23/1999 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 14:07:19. Contact: ###-####. 370-16 Box fill.
|