Final | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 10:17:01. Contact: ###-####.
|
Final | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/29/1999 at 10:04:25. Contact: ###-####. GFI tripping.
|
Permanent Service | 10/18/1999 | 10/19/1999 | 10/19/1999 | A | PASS |
Joe Ray
|
|
|
CLYDE REINSPECTION ###-####
|
Rough-In Permanent Service | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | PART |
Joe Ray
|
|
|
cl ###-#### R/I ok P/S not ready
|