Final | 2/7/2000 | 2/7/2000 | 2/7/2000 | P | PASS |
Pat Lass
|
|
|
###-#### final okay
|
Final | 1/19/2000 | 1/20/2000 | 1/20/2000 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/19/2000 at 10:40:11. Contact: ###-####. Open wires. 1/20/00 4:25:08 PM
|
Final | 1/19/2000 | 1/20/2000 | 1/20/2000 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/19/2000 at 14:26:04. Contact: ###-####. T/O ok. 1/21/00 9:16:13 AM
|
Permanent Service | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/13/2000 at 10:54:43. Contact: ###-####. P/S Ok.
|
Electrical Rough-In | 1/3/2000 | 1/3/2000 | 1/3/2000 | P | PART |
Pat Lass
|
|
|
tim ###-#### r/i. Walls ok.
|