Final | 11/23/1999 | 11/24/1999 | 11/24/1999 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/23/1999 at 11:34:39. Contact: ###-####.
|
Electrical Rough-In | 10/21/1999 | 10/21/1999 | 10/21/1999 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/21/1999 at 09:32:59. Contact: ###-####.
|