Final | 1/12/2000 | 1/13/2000 | 1/13/2000 | A | FAIL |
Pat Lass
|
|
|
Mike ###-####. Show window recep.
|
Final | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | PASS |
Pat Lass
|
|
|
###-#### MIKE. Final ok.
|
Electrical Rough-In | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | PASS |
Pat Lass
|
|
|
mike ###-#### R/I ok.
|
Final | 12/10/1999 | 12/10/1999 | 12/10/1999 | P | FAIL |
Pat Lass
|
|
|
temp occ insp-?--- ###-#### -mike Open wires not ready.
|
Electrical Rough-In | 10/28/1999 | 10/29/1999 | 10/29/1999 | A | PASS |
Pat Lass
|
|
|
late am//--mike ###-#### r/I Wall R/I ok
|
Electrical Rough-In | 10/26/1999 | 10/27/1999 | 10/27/1999 | A | PART |
Pat Lass
|
|
|
Mike ###-#### partial R/I ok
|
Electrical Rough-In | 10/21/1999 | 10/22/1999 | 10/22/1999 | A | PASS |
Pat Lass
|
|
|
PARTIAL R/I WALLS MIKE ###-#### Part ok
|