Final | 2/17/2000 | 2/17/2000 | 2/17/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 08:02:25. Contact: ###-####. pole --will be s.e. of the transformer #0p4 final ok. 2/18/00 9:51:43 AM
|
Electrical Rough-In | 11/4/1999 | 11/5/1999 | 11/5/1999 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/04/1999 at 22:43:08. Contact: ###-####. U/G ok
|