Rough-In Permanent Service | 1/24/2000 | 1/25/2000 | 1/25/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/24/2000 at 16:55:57. Contact: . Final ok. 1/26/00 9:03:46 AM
|
Electrical Rough-In | 11/5/1999 | 11/8/1999 | 11/8/1999 | A | PASS |
Joe Ray
|
|
|
DON--- ###-#### R/I Bathroom outlet shall be 20 amp ciruit
|