Final | 12/10/1999 | 12/10/1999 | 12/10/1999 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/10/1999 at 09:06:48. Contact: ###-####. Final ok.
|
Electrical Rough-In | 11/16/1999 | 11/16/1999 | 11/16/1999 | P | PASS |
Pat Lass
|
|
|
KURT-- ###-#### WALL COVER INSP Wall R/I ok.
|
Electrical Rough-In | 11/10/1999 | 11/12/1999 | 11/12/1999 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/10/1999 at 16:32:29. Contact: . far south building paralle to franklin road-jim anderson is the contract. Outside walls ok.
|
Electrical Rough-In | 11/10/1999 | 11/10/1999 | 11/10/1999 | P | FAIL |
Pat Lass
|
|
|
EXTERIOR WALL INS--KURT-- ###-#### work in wrong place.
|