Final | 11/22/1999 | 11/23/1999 | 11/23/1999 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 10:07:05. Contact: ###-####. Final ok.
|
Electrical Rough-In | 11/22/1999 | 11/22/1999 | 11/22/1999 | P | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 08:25:48. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/22/1999 at 08:33:11.
|
Final | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | FAIL |
Pat Lass
|
|
|
ROCKY MTN ###-#### FN Open wires.
|
Electrical Rough-In | 11/8/1999 | 11/9/1999 | 11/10/1999 | P | PASS |
Pat Lass
|
|
|
mark ###-####--ok to cover R/I ok.
|