Final | 11/11/1999 | 11/12/1999 | 11/12/1999 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/11/1999 at 11:46:58. Contact: ###-####.TEMP OKAY WITH JOE AS PER PHONE CALL
|
Temporary Service | 11/9/1999 | 11/9/1999 | 11/9/1999 | P | FAIL |
Joe Ray
|
|
|
BILL-- ###-#### TEMP POLE FAILED REINSPECTION FEE
|