Final | 4/4/2000 | 4/5/2000 | 4/5/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 04/04/2000 at 08:45:35. Contact: ###-####. Final ok no card 4/6/00 8:55:22 AM
|
Final | 2/25/2000 | 2/28/2000 | 2/28/2000 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/25/2000 at 15:53:17. Contact: ###-####. P/S ok. 2/29/00 3:10:42 PM
|
Electrical Rough-In | 2/24/2000 | 2/25/2000 | 2/25/2000 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/24/2000 at 14:20:19. Contact: ###-####. Partial R/I ok. 2/25/00 3:09:00 PM
|
Electrical Rough-In | 2/23/2000 | 2/23/2000 | 2/23/2000 | P | PART |
Pat Lass
|
|
|
###-#### becky\\Conf Eves ok r/I. 2/25/00 9:30:44 AM
|