Final | 3/13/2000 | 3/13/2000 | 3/13/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 08:05:04. Contact: ###-####. final ok. 3/14/00 1:27:08 PM
|
Electrical Rough-In | 2/22/2000 | 2/22/2000 | 2/22/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/22/2000 at 09:45:07. Contact: ###-####. Ceiling for cover. 2/23/00 11:28:29 AM
|
Electrical Rough-In | 2/16/2000 | 2/16/2000 | 2/16/2000 | P | FAIL |
Pat Lass
|
|
|
Vicki ###-#### Cords through walls & 250-32 (b) (1). 2/17/00 8:57:28 AM
|
Electrical Rough-In | 11/16/1999 | 11/16/1999 | 11/16/1999 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/16/1999 at 09:32:05. Contact: ###-####. U/G ok.
|