Final | 12/21/1999 | 12/21/1999 | 12/21/1999 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/21/1999 at 10:24:55. Contact: ###-####.
|
Electrical Rough-In | 11/12/1999 | 11/15/1999 | 11/15/1999 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/12/1999 at 09:20:43. Contact: ###-####. p/s also
|