Final | 11/26/1999 | 11/29/1999 | 11/29/1999 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/26/1999 at 15:47:33. Contact: ###-####.(call for what? JMS) Final ok.
|
Electrical Rough-In | 11/17/1999 | 11/18/1999 | 11/18/1999 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/17/1999 at 17:00:54. Contact: ###-####. Ceiling R/I.
|
Electrical Rough-In | 11/15/1999 | 11/15/1999 | 11/15/1999 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/15/1999 at 08:13:41. Contact: ###-####. Ele. R/I; remodel.
|