Final | 1/5/2000 | 1/6/2000 | 1/6/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/05/2000 at 11:50:15. Contact: ###-####.
|
Electrical Rough-In | 11/22/1999 | 11/22/1999 | 11/22/1999 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 10:50:37. Contact: ###-####.
|