Final | 12/23/1999 | 12/23/1999 | 12/23/1999 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 12/23/1999 at 09:19:31. Contact: ###-####. Ok final 1st floor NW corner.
|
Electrical Rough-In | 11/24/1999 | 11/26/1999 | 11/26/1999 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/24/1999 at 13:50:12. Contact: ###-####. 1st floor, walls ele. R/I.
|
Electrical Rough-In | 11/19/1999 | 11/19/1999 | 11/19/1999 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/19/1999 at 11:20:39. Contact: ###-####. 1st floor; Stewart Title Ele. R/I: walls.
|