Final | 2/28/2000 | 2/29/2000 | 2/29/2000 | A | FAIL |
Joe Ray
|
|
|
###-#### paul pager # J-boxes not bombed, grd electrodes for cooling towers. Bond pole lights at hand hole support conduit at 3', GFEP for heat tape. 3/1/00 11:15:22 AM
|
Final | 2/28/2000 | 2/28/2000 | 2/28/2000 | P | FAIL |
Joe Ray
|
|
|
pager ###-#### No one on site called contr. 2/29/00 3:06:20 PM
|
Electrical Rough-In | 11/30/1999 | 11/30/1999 | 11/30/1999 | P | PART |
Joe Ray
|
|
|
steve pager # ###-#### --bld #5 chiller expansion r/I Partial under ground.
|