Final | 2/16/2000 | 2/17/2000 | 2/17/2000 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/16/2000 at 11:04:22. Contact: ###-####. Final ok. 2/17/00 2:17:42 PM
|
Rough-In Permanent Service | 12/7/1999 | 12/7/1999 | 12/7/1999 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/07/1999 at 10:44:06. Contact: ###-####. P/S U/G ok.
|
Rough-In Permanent Service | 11/24/1999 | 11/29/1999 | 11/29/1999 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/24/1999 at 10:31:37. Contact: ###-####. Grounding bonding depth of raceways.
|