Final | 1/3/2000 | 1/4/2000 | 1/4/2000 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 15:40:18. Contact: ###-####. Ok.
|
Electrical Rough-In | 12/29/1999 | 12/30/1999 | 12/30/1999 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 12:45:39. Contact: ###-####. Ceiling Ele. R/I.
|
Electrical Rough-In | 11/29/1999 | 11/30/1999 | 11/30/1999 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 11/29/1999 at 10:29:47. Contact: ###-####. Retail remodel Ele. R/I.
|