Final | 6/29/2000 | 6/29/2000 | 6/28/2000 | A | PASS |
Jack Frank
|
|
|
final ok
|
Electrical Rough-In | 6/27/2000 | 6/28/2000 | 6/28/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/27/2000 at 11:52:07. Contact: ###-####. ok 6/29/00 10:15:22 AM
|
Final | 6/13/2000 | 6/14/2000 | 6/14/2000 | A | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/13/2000 at 16:55:18. Contact: ###-####. called 6/15/00 11:40:17 AM
|
Electrical Rough-In | 1/20/2000 | 1/21/2000 | 1/21/2000 | P | PASS |
Jack Frank
|
|
|
###-#### R/I ok. 1/25/00 11:45:31 AM
|
Electrical Rough-In | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | CANC |
Jack Frank
|
|
|
###-#### Duplicate. 1/25/00 11:45:41 AM
|
Rough-In Permanent Service | 1/14/2000 | 1/14/2000 | 1/14/2000 | P | PART |
Jack Frank
|
|
|
jody ###-#### before 4pm P/S U/G N ok no R/I. 1/14/00 3:58:49 PM
|