Final | 1/24/2000 | 1/25/2000 | 1/25/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/24/2000 at 15:54:36. Contact: ###-####.
|
Rough-In Permanent Service | 11/30/1999 | 12/1/1999 | 12/1/1999 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/30/1999 at 13:40:48. Contact: ###-####. R/I P/S U/G New.
|