Final | 1/26/2000 | 1/28/2000 | 1/28/2000 | P | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 01/26/2000 at 08:06:32. Contact: ###-####.\\ no access called contractor they call for reinspection.
|
Final | 1/25/2000 | 1/25/2000 | 1/25/2000 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/25/2000 at 11:04:47. Contact: ###-####. Lime-load reversed called contr. 1/26/00 9:04:11 AM
|
Final | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 08:40:08. Contact: ###-####. Reverse polarity called contr. 1/25/00 11:57:57 AM
|
Rough-In Permanent Service | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | PASS |
Joe Ray
|
|
|
###-#### CL 12 ROOMS A/C 100 AMPS
|