Final | 1/6/2000 | 1/7/2000 | 1/7/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/06/2000 at 15:35:58. Contact: ###-####.
|
Electrical Rough-In | 12/28/1999 | 12/29/1999 | 12/29/1999 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/28/1999 at 13:03:02. Contact: ###-####.
|
Electrical Rough-In | 12/6/1999 | 12/7/1999 | 12/7/1999 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 15:31:12. Contact: ###-####.
|