Final | 12/22/1999 | 12/23/1999 | 12/23/1999 | A | FAIL |
Pat Lass
|
|
|
###-####-FRANK--FN. GFCI and furnace not on it's own circuit.
|
Final | 12/23/1999 | 12/23/1999 | 12/23/1999 | P | PASS |
Pat Lass
|
|
|
per pat lass- at 1:30--frank ###-####. Final ok.
|
Final | 12/17/1999 | 12/20/1999 | 12/20/1999 | A | PART |
Pat Lass
|
|
|
APPROX 8:30 FN --PER JIM S---FRANK ###-#### P/S ok not ready for final no power.
|
Final | 12/16/1999 | 12/17/1999 | 12/17/1999 | A | FAIL |
Pat Lass
|
|
|
FRANK-- ###-#### FN -CALL 1ST BEFORE INSP No access.
|
Permanent Service | 12/15/1999 | 12/16/1999 | 12/16/1999 | A | FAIL |
Pat Lass
|
|
|
FRANK ###-#### AFTER MEETING Bond gas 2 screws for receps in raised covers.
|
Electrical Rough-In | 12/8/1999 | 12/8/1999 | 12/8/1999 | P | FAIL |
Pat Lass
|
|
|
Frank ###-#### call for access hour or so ahead Guy kit light at panel recep. Required.
|